Emergency Transformer Change

filler 16 March 2016

PBA came to the rescue when a 33/11kV distribution transformer failed.  

MORE >

33kV Cable Terminations

filler 15 March 2016

PBA were engaged to complete two sets of 33kV cable terminations as part of a switching station upgrade. 

MORE >

220kV CB Head Overhaul

filler 1 July 2015

Following on from the 220KV CB head replacement at Haywards substation, PBA were engaged to carry out a major overhaul of the removed CB heads to enable Transpower to keep these as serviceable spares.

MORE >

ABB HPL CB Head Replacement

filler 21 May 2015

Recently PBA were engaged to carry out a set of head replacements on a 220kV ABB HPL Circuit Breaker at Haywards substation.

MORE >

Hyundai Transformer Installations

filler 9 January 2015

PBA have recently completed executing a trio of high profile transformer installation projects for Hyundai Heavy Industries.