PBA Product Catalogue

filler 19 July 2017

PBA have released a products catalogue full of hardware you would need to maintain SF6 assets as well as a handy tool to monitor your transformer fleet.  Contact us today to receive a copy!

MORE >

PBA Gains ACC WSMP Tertiary Level

filler 9 March 2017

ACC Cert CoverHaving recently completed the bi-annual ACC Workplace Safety Management Practices (WSMP) audit, PBA has received notice from ACC confirming that PBA achieved tertiary level.

MORE >

PBA’s PREQUAL Requalification

filler 9 March 2017

CPNZ Cover Page 01PREQUAL, previously known as CPNZ, is a New Zealand client led, fully outsourced, pan-industry contractor prequalification scheme originally set up with input from New Zealand’s leading generation companies.

MORE >

Tom Bromfield

filler 22 August 2016

Tom Bromfield 100x138Tom is an exceptional example of a highly skilled cable jointer, with a solid work ethic and personal industry competencies who is also backed by a contracting organisation holding client accreditations and insurances.

MORE >

John Hadjis

filler 16 June 2016


JH2John Hadjis has thirty years’ experience within the telecommunications and electrical industries working with some of New Zealand’s leading organisations.

MORE >

Tajan Domingo

filler 9 June 2016

ZTaj Domingo Photo 2From managing maintenance projects for Transpower as far back as 2005 Taj has built up a wealth of experience in the HV industry.

MORE >

HVDC Pole 3 Upgrade

filler 9 June 2016

PBA were subcontracted by Siemens throughout the HVDC Pole 3 Project at Transpower’s Haywards and Benmore substations.

MORE >

Mike McLay

filler 30 May 2016


Z Mike McLay photoMike McLay has over 15 years’ experience in the New Zealand's high voltage industry and specialises in general High Voltage equipment requirements including SF6 supply and leak detection.

MORE >

Emergency Transformer Change

filler 16 March 2016

PBA came to the rescue when a 33/11kV distribution transformer failed.  

MORE >

33kV Cable Terminations

filler 15 March 2016

PBA were engaged to complete two sets of 33kV cable terminations as part of a switching station upgrade. 